[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:tpl-lombardia-lazio:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":189,"infographics":190,"seo":193,"language":194,"unpublished":7,"related":195},"tpl-lombardia-lazio","2026-06-18","governance-regole-mercato",false,"LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",1,[17,20,22,26,28,30,32,34,36,38,93,95,97,99,101,172,174,176,181,183,185],{"type":18,"html":19},"paragraph","\u003Cp>The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>The data examined show a clear and unequivocal divide in terms of public resources allocated. While the \u003Cstrong>Milan basin\u003C\u002Fstrong>allocates \u003Cstrong>€1.248 billion\u003C\u002Fstrong> for a \u003Cstrong>7-year contract\u003C\u002Fstrong>, ensuring a weighted average compensation of \u003Cstrong>€4.17 per km\u003C\u002Fstrong> (rising to €4.46 per km when including over \u003Cstrong>€86 million\u003C\u002Fstrong> in capital contributions exclusively intended for fleet renewal), the \u003Cstrong>Lazio Region\u003C\u002Fstrong> has tendered a total value of \u003Cstrong>€630.5 million\u003C\u002Fstrong> spread over \u003Cstrong>9 years\u003C\u002Fstrong>, corresponding to a weighted average compensation of just \u003Cstrong>€2.33 per km\u003C\u002Fstrong>, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.\u003C\u002Fp>\n",{"type":23,"level":24,"text":25},"heading",2,"The Structural Divide in Local Mobility",{"type":18,"html":27},"\u003Cp>Local public transport represents the main driver of connectivity, environmental sustainability, and citizens’ right to mobility. However, the industrial and financial architecture of intercity and suburban procurement tenders in Italy is revealing a deep and concerning asymmetry between high-investment models in the North and economically underfunded procedures in Central and Southern regions. A direct comparison between the new open procedure for the Milan metropolitan basin and the regional tender in Lazio provides a clear quantitative illustration of this imbalance.\u003C\u002Fp>\n",{"type":23,"level":24,"text":29},"The Milan Model: Industrial Remuneration and Financial Endowment for Fleet Renewal",{"type":18,"html":31},"\u003Cp>The Public Transport Agency for the metropolitan area of Milan, Monza and Brianza, Lodi, and Pavia has structured its tender around four self-sufficient territorial lots, with a total tender value of \u003Cstrong>€1,248,382,000\u003C\u002Fstrong> and a contract duration of \u003Cstrong>seven years\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":33},"\u003Cp>The Lombardy transport plan is based on a progressive increase in service mileage, (implemented through three successive phases). Operations are expected to grow from approximately 36.5 million bus-kilometres in the first year of service to a consolidated annual level of more than \u003Cstrong>54.4 million bus-kilometres\u003C\u002Fstrong> from the third through the seventh year. Remuneration follows an incentive-based \u003Cem>gross-cost model\u003C\u002Fem>, consisting of a 65% fixed all-inclusive component and a 35% variable component indexed to passenger demand.\u003C\u002Fp>\n",{"type":18,"html":35},"\u003Cp>The cornerstone of the Milan tender is the direct allocation of financial resources to support the ecological and technological transition of the fleet. The contracting authority provides \u003Cstrong>€86,019,000\u003C\u002Fstrong> in capital grants (funded through the National Strategic Plan for Sustainable Mobility and regional resources), earmarked exclusively for fleet renewal.This investment enables the authority to impose contractual obligations requiring that 100% of the fleet, once fully deployed, be equipped with Advanced Driver Assistance Systems (ADAS), Blind Spot Detection systems, automatic passenger-counting equipment, and integrated video surveillance systems.\u003C\u002Fp>\n",{"type":18,"html":37},"\u003Cp>The table below presents the economic and operational indicators, expressed on a per-kilometre basis, calculated for each lot within the Milan transport basin over the entire seven-year concession period.\u003C\u002Fp>\n",{"type":39,"head":40,"rows":48,"numeric":89,"rowHeads":90,"title":91,"caption":92},"table",[41,42,43,44,45,46,47],"Lots","Total km","Base compensation (€)","€\u002Fkm (compensation only)","Capital grants (€)","Total compensation + grants (€)","Total €\u002Fkm",[49,57,65,73,81],[50,51,52,53,54,55,56],"Lot 1","51,176,500","179,835,000","3.51","13,505,000","193,340,000","3.78",[58,59,60,61,62,63,64],"Lot 2","81,201,500","367,928,000","4.53","39,328,000","407,256,000","5.02",[66,67,68,69,70,71,72],"Lot 3","77,518,000","334,541,000","4.32","15,062,000","349,603,000","4.51",[74,75,76,77,78,79,80],"Lot 4","89,161,500","366,078,000","4.11","18,124,000","384,202,000","4.31",[82,83,84,85,86,87,88],"Basin total","299,057,500","1,248,382,000","4.17","86,019,000","1,334,401,000","4.46",[7,90,90,90,90,90,90],true,"Tabella 1: Analisi Economica e Chilometrica Gara TPL Milano (Totale su 7 Anni)",null,{"type":23,"level":24,"text":94},"The Lazio Region Procedure: Tariff Fragmentation and a “Net Cost” Concession",{"type":18,"html":96},"\u003Cp>On the opposite end of the spectrum, the Lazio Region and the contracting authority Astral S.p.A. have launched a tender for the concession of minimum provincial transport services, divided into \u003Cstrong>11 Network Units (lots)\u003C\u002Fstrong>. The procedure presents structural characteristics that contrast sharply with the Lombardy model: the total estimated tender value amounts to \u003Cstrong>€630,503,635\u003C\u002Fstrong>, covering a contract duration of \u003Cstrong>nine years(2024–2032)\u003C\u002Fstrong> .\u003C\u002Fp>\n",{"type":18,"html":98},"\u003Cp>The total planned service volume over the nine-year period is \u003Cstrong>270,368,274.98 vehicle-kilometres\u003C\u002Fstrong>. The chosen award model is a “net cost” scheme, meaning that the commercial risk associated with ticket sales and fare revenue performance lies entirely with the awarded operators.\u003C\u002Fp>\n",{"type":18,"html":100},"\u003Cp>Furthermore, the approach to fleet renewal is the reverse of the Milan case. Capital grants included in the base tender are set to zero (\u003Cstrong>€0.00\u003C\u002Fstrong>). The Lazio Region does not provide direct monetary contributions within the contract for vehicle amortisation. Instead, it commits to transferring to the winning operators, under a free usufruct arrangement, a share of vehicles centrally purchased through the FSC and regional funds. Operators are required to finance the remaining fleet requirements at their own expense.\u003C\u002Fp>\n",{"type":39,"head":102,"rows":107,"numeric":169,"rowHeads":90,"title":170,"caption":171},[103,104,43,105,106,46],"Lot \u002F network unit","Total km (9 years)","Base €\u002Fkm","Capital grants*",[108,114,119,124,129,134,139,144,149,154,159,164],[109,110,111,112,113,111],"Lot 1 (Tirreno Nord)","30,690,171.19","70,280,492.01","2.29","Not provided",[115,116,117,118,113,117],"Lot 2 (Valli del Tevere)","24,027,509.70","61,270,149.76","2.55",[120,121,122,123,113,122],"Lot 3 (Valle del Sacco)","26,142,639.60","62,742,335.04","2.40",[125,126,127,128,113,127],"Lot 4 (Castelli Romani)","22,985,083.12","59,991,066.93","2.61",[130,131,132,133,113,132],"Lot 5 (Valle dell’Aniene)","14,516,299.26","34,258,466.25","2.36",[135,136,137,138,113,137],"Lot 6 (Tuscia)","20,397,123.18","44,465,728.59","2.18",[140,141,142,143,113,142],"Lot 7 (Reatino)","11,223,417.51","26,823,967.83","2.39",[145,146,147,148,113,147],"Lot 8 (Terra di Lavoro)","20,051,159.64","48,724,317.97","2.43",[150,151,152,153,113,152],"Lot 9 (Ciociaria)","36,102,967.00","90,618,447.16","2.51",[155,156,157,158,113,157],"Lot 10 (Litorale Sud)","30,189,612.96","64,605,771.72","2.14",[160,161,162,163,113,162],"Lot 11 (Sud Pontino)","34,042,291.82","66,722,891.96","1.96",[165,166,167,168,113,167],"Regional total","270,368,274.98","630,503,635.22","2.33",[7,90,90,90,7,90],"Table 2: Economic and Operational Analysis of the Lazio Region TPL Tender – Astral (Total over 9 Years)","Note: The Lazio Region (ASTRAL) does not provide monetary contributions included in the service remuneration for the depreciation of privately owned vehicles; instead, it transfers to the successful operators, under a free usufruct arrangement, a share of vehicles centrally purchased through FSC and regional funds.",{"type":23,"level":24,"text":173},"Comparative Analysis of Unit Value: The Gap in Per-Kilometre Funding",{"type":18,"html":175},"\u003Cp>The mathematical evidence of a two-speed Italian public transport system becomes clear when comparing the weighted average overall economic value recognised per contract lot (€\u002Fvehicle-kilometre):\u003C\u002Fp>\n",{"type":177,"ordered":7,"icon":92,"items":178},"list",[179,180],"The \u003Cstrong>Milan\u003C\u002Fstrong> tender guarantees awarded operators a weighted average compensation of \u003Cstrong>€4.17 per kilometre\u003C\u002Fstrong>. When the impact of fleet investment funding included in the tender is factored in, the total mobilised investment rises to \u003Cstrong>€4.46 per kilometre\u003C\u002Fstrong>.","The \u003Cstrong>Lazio\u003C\u002Fstrong> tender stands at a significantly lower weighted average of \u003Cstrong>€2.33 per kilometre\u003C\u002Fstrong>, reaching a minimum of \u003Cstrong>€1.96\u002Fkm\u003C\u002Fstrong> in Lot 11 (South Pontine extra-urban area).",{"type":18,"html":182},"\u003Cp>This results in a structural gap of \u003Cstrong>€1.84 less per kilometre\u003C\u002Fstrong> in the Lazio region compared to Milan. This asymmetry has a direct impact on service robustness: a lower per-kilometre compensation sharply reduces industrial margins needed to absorb fixed driver labour costs (governed by social safeguard clauses), limits resources allocated to preventive maintenance of depots and vehicles, and weakens the commercial attractiveness of tenders for large private operators or established transport companies.\u003C\u002Fp>\n",{"type":18,"html":184},"\u003Cp>The consequences of this underfunding are also evident at the administrative level. While the Milan tender is moving towards operational implementation, the Lazio extra-urban procedure (originally published in early 2023) remains partially stalled or incomplete due to a high number of administrative appeals and the lack of financial sustainability in the Economic and Financial Plans (EFPs) across several territorial lots, forcing many municipalities to remain tied to costly extensions and temporary renewals of incumbent operators.\u003C\u002Fp>\n",{"type":186,"label":187,"html":188},"note","Note","\u003Cp>\u003Cstrong>The \u003Cem>Incentive Gross Cost Model\u003C\u002Fem> (Milan Tender):\u003C\u002Fstrong> All revenue generated from the sale of travel tickets is collected directly by the Contracting Authority. The operator is remunerated through an all-inclusive per-kilometer fee which, in the case of Milan, is structured into two components: a \u003Cstrong>fixed portion equal to 65%\u003C\u002Fstrong> (covering basic operating costs) and a \u003Cstrong>variable portion equal to 35%\u003C\u002Fstrong>, directly indexed to and linked with the number of fare-paying passengers actually transported.\u003C\u002Fp>\n\u003Cp>\u003Cstrong>The \u003Cem>Net Cost\u003C\u002Fem> Model (\u003Ca href=\"https:\u002F\u002Fwww.regione.lazio.it\u002F\">Lazio Region Tender\u003C\u002Fa>):\u003C\u002Fstrong> All ticketing revenues are retained directly by the operator. The public payment does not cover the full value of the service but serves solely as an operating compensation, calculated as the difference between standard operating costs and the forecast fare revenues. Consequently, the operational and commercial demand risk remains entirely with the private operator.\u003C\u002Fp>\n","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf",[191],{"thumb":192,"large":14,"full":189,"alt":13},"\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=200&format=webp",{"title":92,"description":92,"image":92,"noindex":7},"en",[196,206,216],{"slug":197,"date":198,"theme":6,"featured":7,"title":199,"abstract":200,"cover":201,"coverAlt":202,"infographic":203,"infographicAlt":204,"infographicLarge":205,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":207,"date":208,"theme":6,"featured":7,"title":209,"abstract":210,"cover":211,"coverAlt":212,"infographic":213,"infographicAlt":214,"infographicLarge":215,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp",{"slug":217,"date":218,"theme":6,"featured":7,"title":219,"abstract":220,"cover":221,"coverAlt":222,"infographic":223,"infographicAlt":224,"infographicLarge":225,"infographicCount":15},"gare-tpl-piemonte-bacino-sud","2026-04-30","Piemonte region public transport tenders: southern basin, two lots of 16.18 million km\u002Fyear for €31.99 million in annual compensation","The configuration of the Southern Basin identifies two tendered lots with a total annual compensation of €31.99 million and expected fare revenues of €17.23 million per year. The basin covers the entire Province of Cuneo and is characterized by strong integration between urban and extra-urban services, with an already defined structure and a system currently concentrated under the Consorzio Granda Bus.","\u002Fapi\u002Fassets\u002F59033770-7080-4793-9f1e-9835813fd351?width=800&format=webp","Mobility Metrics cover: map of Piedmont's southern basin (province of Cuneo) showing the two tender lots, L1 East and L2 West, alongside Cuneo's civic tower","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=500&format=webp","Infographic on Piedmont's southern basin tender: two lots of 8.0 and 8.1 million km a year, €31.9m compensation and €17.2m expected fare revenue, averaging €3.04\u002Fkm","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=1000&format=webp"]