[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:tpl-lombardia-como-lecco-e-varese:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":125,"infographics":126,"seo":129,"language":130,"unpublished":7,"related":131},"tpl-lombardia-como-lecco-e-varese","2026-05-06","governance-regole-mercato",false,"Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",1,[17,20,22,24,62,66,68,85,87,89,91,93,95,97,99,101,103,105,107,109,111,113,115,117,119,121,123],{"type":18,"html":19},"paragraph","\u003Cp>The tender for local public transport in the \u003Cstrong>Como, Lecco and Varese\u003C\u002Fstrong> catchment area is set to reshape the organisation of road transport services in one of Lombardy’s most complex regions. The new structure envisaged by the Catchment Area Programme is based on an annual service volume of approximately \u003Cstrong>31.68 million vehicle-kilometres\u003C\u002Fstrong>, divided into five territorial lots, with a significant predominance of extra-urban services over urban ones.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>Urban service provision amounts to approximately \u003Cstrong>9.4 million km per year\u003C\u002Fstrong>, whilst extra-urban provision exceeds \u003Cstrong>22.28 million km per year\u003C\u002Fstrong>. This figure confirms the polycentric and inter-provincial nature of the catchment area, where the service is not limited to mobility within the main urban centres, but performs an essential function in connecting territories, valleys, lake areas, industrial hubs, schools and railway junctions.\u003C\u002Fp>\n",{"type":18,"html":23},"\u003Cp>The lot with the highest mileage is \u003Cstrong>Lot 4, Varese and the Valleys\u003C\u002Fstrong>, with \u003Cstrong>6,936,341 km per year\u003C\u002Fstrong>. This is followed by \u003Cstrong>Lot 2, Brianza Comasca\u003C\u002Fstrong>, with \u003Cstrong>6,559,795 km per year\u003C\u002Fstrong>; \u003Cstrong>Lot 1, Como and the Lake\u003C\u002Fstrong>, with \u003Cstrong>6,291,950 km per year\u003C\u002Fstrong>; \u003Cstrong>Lot 5, Varesotto\u003C\u002Fstrong>, with \u003Cstrong>5,975,218 km\u002Fyear\u003C\u002Fstrong>, and \u003Cstrong>Lot 3, Lecco\u003C\u002Fstrong>, with \u003Cstrong>5,919,043 km\u002Fyear\u003C\u002Fstrong>. The distribution therefore appears relatively balanced in terms of mileage, but not necessarily uniform from an industrial perspective, as each lot has different territorial, infrastructural and operational characteristics.\u003C\u002Fp>\n",{"type":25,"head":26,"rows":34,"numeric":58,"rowHeads":59,"title":60,"caption":61},"table",[27,28,29,30,31,32,33],"Production (km)","Lot 1 “Como e Lago”","Lot 2 “Brianza Comasca”","Lot 3 “Lecco”","Lot 4 “Varese e le Valli”","Lot 5 “Varesotto”","Total",[35,43,51],[36,37,38,39,40,41,42],"Urban","2,614,499","116,435","1,525,714","2,817,261","2,322,732","9,396,640",[44,45,46,47,48,49,50],"Extra-urban","3,677,452","6,443,360","4,393,329","4,119,080","3,652,487","22,285,707",[33,52,53,54,55,56,57],"6,291,950","6,559,795","5,919,043","6,936,341","5,975,218","31,682,348",[7,59,59,59,59,59,59],true,null,"Source: Consultation Document of 9 May 2025 concerning the Como, Lecco and Varese catchment area",{"type":63,"level":64,"text":65},"heading",2,"Estimated economic values of the tender",{"type":18,"html":67},"\u003Cp>Based on the estimate prepared, the \u003Cstrong>total value of the tender\u003C\u002Fstrong> fees amounts to \u003Cstrong>€71,025,760 per annum\u003C\u002Fstrong>. Added to this is \u003Cstrong>€21,307,728 in expected fare revenue\u003C\u002Fstrong>, giving a total economic value of approximately \u003Cstrong>€92.33 million per annum\u003C\u002Fstrong>.\nThe average value of the fee is approximately \u003Cstrong>€2.24 per km\u003C\u002Fstrong>. The expected tariff revenues average \u003Cstrong>€0.67 per km\u003C\u002Fstrong>. This results in an estimated average total economic value of approximately \u003Cstrong>€2.92 per km\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":25,"head":69,"rows":76,"numeric":84,"rowHeads":59,"title":60,"caption":60},[70,71,72,73,74,75],"Km\u002Fyear","SIMATO compensation (€)","SIMATO expected revenue (€)","Compensation €\u002Fkm","SIMATO expected revenue €\u002Fkm","Estimated total €\u002Fkm",[77],[78,79,80,81,82,83],"31,682,347","71,025,760","21,307,728","2.24","0.67","2.92",[7,59,59,59,59,59],{"type":18,"html":86},"\u003Cp>\u003Cstrong>Methodological notes for the economic estimate\u003C\u002Fstrong>\u003C\u002Fp>\n",{"type":18,"html":88},"\u003Cp>\u003Cem>2026 COMPENSATION:\u003C\u002Fem>\u003C\u002Fp>\n",{"type":18,"html":90},"\u003Cp>\u003Cem>The data are derived from the official allocation by the Lombardy Region (Regional Council Decision for 2024\u002F2025), which has allocated a total of approximately €675 million to ensure the continuity of the service until 31 December 2026.\u003C\u002Fem>\u003C\u002Fp>\n",{"type":18,"html":92},"\u003Cp>\u003Cem>FARE REVENUES:\u003C\u002Fem>\u003C\u002Fp>\n",{"type":18,"html":94},"\u003Cp>\u003Cem>These have been estimated by applying a cost-recovery ratio typical of the Lombardy system (approximately 35% for Milan and 25–30% for other catchment areas).\u003C\u002Fem>\u003C\u002Fp>\n",{"type":18,"html":96},"\u003Cp>Source: Regional Public Transport Observatory – \u003Ca href=\"https:\u002F\u002Fwww.regione.lombardia.it\u002F\">Lombardy Region\u003C\u002Fa>\u003C\u002Fp>\n",{"type":63,"level":64,"text":98},"Staff: over a thousand employees to be transferred",{"type":18,"html":100},"\u003Cp>One of the key issues in the tender concerns staff. As at 31 December 2024, \u003Cstrong>1,343 employees\u003C\u002Fstrong> were working in the services within the catchment area, equivalent to \u003Cstrong>1,243.7 FTEs\u003C\u002Fstrong>. Of these, the document provides for the transfer of \u003Cstrong>1,234 employees\u003C\u002Fstrong> to the new contractors.\u003C\u002Fp>\n",{"type":18,"html":102},"\u003Cp>The main component consists of driving staff, numbering \u003Cstrong>992 employees\u003C\u002Fstrong>, i.e. approximately \u003Cstrong>80.5%\u003C\u002Fstrong> of the total to be transferred. This is followed by \u003Cstrong>58 operations\u003C\u002Fstrong> staff, \u003Cstrong>70 maintenance\u003C\u002Fstrong> staff and \u003Cstrong>114 depot and administrative staff\u003C\u002Fstrong>. The average annual cost per employee, based on 2024 figures, is stated as \u003Cstrong>€44,441\u003C\u002Fstrong>, with variations between the different lots.\u003C\u002Fp>\n",{"type":18,"html":104},"\u003Cp>This factor is particularly significant because labour costs represent one of the main components of the service’s operating costs. The sustainability of the tender will therefore also depend on the ability to properly absorb the outgoing staff, ensuring continuity of employment whilst maintaining operational efficiency.\u003C\u002Fp>\n",{"type":63,"level":64,"text":106},"Buses: 857 vehicles required, 215 to be procured from scratch",{"type":18,"html":108},"\u003Cp>The rolling stock requirement is estimated at \u003Cstrong>857 buses\u003C\u002Fstrong>, comprising \u003Cstrong>209 city buses\u003C\u002Fstrong> and \u003Cstrong>648 intercity buses\u003C\u002Fstrong>. The fleet consists of three main categories: \u003Cstrong>516 essential buses\u003C\u002Fstrong>, purchased with public funding that has not yet been written off and is therefore subject to a take-over obligation; \u003Cstrong>126 available buses\u003C\u002Fstrong>, for which the outgoing operators have expressed a willingness to sell or lease; and \u003Cstrong>215 missing buses\u003C\u002Fstrong>, which will have to be supplied from scratch by the new operators to launch the service.\u003C\u002Fp>\n",{"type":18,"html":110},"\u003Cp>The need to source 215 vehicles is one of the key factors to be considered in the tender. This implies a significant investment requirement on the part of operators, particularly in a market phase where delivery times, fuel technologies, environmental constraints and financial availability may affect the ability to launch the service on time.\u003C\u002Fp>\n",{"type":63,"level":64,"text":112},"Depots and infrastructure: 44 facilities serving the catchment area",{"type":18,"html":114},"\u003Cp>The infrastructure system comprises \u003Cstrong>44 depots\u003C\u002Fstrong> used by the current operators. Geographically, there are \u003Cstrong>14 depots\u003C\u002Fstrong> in the province of Como, covering \u003Cstrong>52,493 square metres\u003C\u002Fstrong>, \u003Cstrong>9 depots\u003C\u002Fstrong> in the province of Lecco, covering \u003Cstrong>24,133 square metres\u003C\u002Fstrong>, and \u003Cstrong>21 depots\u003C\u002Fstrong> in the province of Varese, covering \u003Cstrong>75,276 square metres\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":116},"\u003Cp>Some infrastructure is classified as essential: the depots in \u003Cstrong>Como (Via Colombo and Via Asiago), Lecco (Piazza Bione), Gallarate, Busto Arsizio and Golasecca\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":63,"level":64,"text":118},"A highly complex industrial tender",{"type":18,"html":120},"\u003Cp>The Como–Lecco–Varese tender is not merely a procurement procedure, but a genuine process of industrial reorganisation of local public transport. The figures reveal a substantial catchment area, with an annual mileage exceeding 31 million kilometres, over a thousand employees involved, a substantial bus fleet and a widespread infrastructure network.\u003C\u002Fp>\n",{"type":18,"html":122},"\u003Cp>The sustainability of the operation will depend on the ability to balance three requirements: guaranteeing continuity and quality of service for users, ensuring the economic and financial equilibrium of the lots, and enabling operators to undertake significant investments, particularly in rolling stock.\u003C\u002Fp>\n",{"type":18,"html":124},"\u003Cp>The new contract will therefore serve as a test case for the Lombardy model of public transport organisation: a system called upon to combine efficiency, economic sustainability, staff protection, fleet renewal and service quality across very diverse territories.\u003C\u002Fp>\n","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59",[127],{"thumb":128,"large":14,"full":125,"alt":13},"\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=200&format=webp",{"title":60,"description":60,"image":60,"noindex":7},"en",[132,142,152],{"slug":133,"date":134,"theme":6,"featured":7,"title":135,"abstract":136,"cover":137,"coverAlt":138,"infographic":139,"infographicAlt":140,"infographicLarge":141,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":143,"date":144,"theme":6,"featured":7,"title":145,"abstract":146,"cover":147,"coverAlt":148,"infographic":149,"infographicAlt":150,"infographicLarge":151,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp",{"slug":153,"date":154,"theme":6,"featured":7,"title":155,"abstract":156,"cover":157,"coverAlt":158,"infographic":159,"infographicAlt":160,"infographicLarge":161,"infographicCount":15},"gare-tpl-piemonte-bacino-sud","2026-04-30","Piemonte region public transport tenders: southern basin, two lots of 16.18 million km\u002Fyear for €31.99 million in annual compensation","The configuration of the Southern Basin identifies two tendered lots with a total annual compensation of €31.99 million and expected fare revenues of €17.23 million per year. The basin covers the entire Province of Cuneo and is characterized by strong integration between urban and extra-urban services, with an already defined structure and a system currently concentrated under the Consorzio Granda Bus.","\u002Fapi\u002Fassets\u002F59033770-7080-4793-9f1e-9835813fd351?width=800&format=webp","Mobility Metrics cover: map of Piedmont's southern basin (province of Cuneo) showing the two tender lots, L1 East and L2 West, alongside Cuneo's civic tower","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=500&format=webp","Infographic on Piedmont's southern basin tender: two lots of 8.0 and 8.1 million km a year, €31.9m compensation and €17.2m expected fare revenue, averaging €3.04\u002Fkm","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=1000&format=webp"]