[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"mm-article:gare-tpl-piemonte-bacino-sud:en:live":3},{"slug":4,"date":5,"theme":6,"featured":7,"title":8,"abstract":9,"cover":10,"coverAlt":11,"infographic":12,"infographicAlt":13,"infographicLarge":14,"infographicCount":15,"blocks":16,"metaDescription":9,"infographicFull":85,"infographics":86,"seo":89,"language":90,"unpublished":7,"related":91},"gare-tpl-piemonte-bacino-sud","2026-04-30","governance-regole-mercato",false,"Piemonte region public transport tenders: southern basin, two lots of 16.18 million km\u002Fyear for €31.99 million in annual compensation","The configuration of the Southern Basin identifies two tendered lots with a total annual compensation of €31.99 million and expected fare revenues of €17.23 million per year. The basin covers the entire Province of Cuneo and is characterized by strong integration between urban and extra-urban services, with an already defined structure and a system currently concentrated under the Consorzio Granda Bus.","\u002Fapi\u002Fassets\u002F59033770-7080-4793-9f1e-9835813fd351?width=800&format=webp","Mobility Metrics cover: map of Piedmont's southern basin (province of Cuneo) showing the two tender lots, L1 East and L2 West, alongside Cuneo's civic tower","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=500&format=webp","Infographic on Piedmont's southern basin tender: two lots of 8.0 and 8.1 million km a year, €31.9m compensation and €17.2m expected fare revenue, averaging €3.04\u002Fkm","\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=1000&format=webp",1,[17,20,22,24,26,28,30,32,34],{"type":18,"html":19},"paragraph","\u003Cp>In the Southern Basin, the service configuration outlines a clear tender perimeter, divided into two distinct but balanced territorial lots, with the structure of the South-East Basin already clearly defined in the \u003Ca href=\"https:\u002F\u002Fmtm.torino.it\u002Fit\u002F\">AMP\u003C\u002Fa> report. Total service production amounts to \u003Cstrong>16,179,880 km\u002Fyear\u003C\u002Fstrong>, with \u003Cstrong>annual compensation of €31,992,825\u003C\u002Fstrong> and \u003Cstrong>expected fare revenues of €17,226,906\u003C\u002Fstrong>. The average overall value stands at \u003Cstrong>€3.04\u002Fkm\u003C\u002Fstrong>, while the \u003Cstrong>planned commercial speed is 34.14 km\u002Fh\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":21},"\u003Cp>The two lots are built along clearly identifiable territorial corridors, reflecting the geography of the province and its main urban centers.\u003C\u002Fp>\n",{"type":18,"html":23},"\u003Cp>\u003Cstrong>Lot South-East (L1)\u003C\u002Fstrong> covers Alba, Bra, Fossano, Mondovì, and the south-eastern area of the basin. It accounts for \u003Cstrong>8,051,434 km\u002Fyear\u003C\u002Fstrong>, with \u003Cstrong>annual compensation of €16,252,136\u003C\u002Fstrong> and \u003Cstrong>expected fare revenues of €8,751,150\u003C\u002Fstrong>. The overall economic value reaches \u003Cstrong>€3.11\u002Fkm\u003C\u002Fstrong>, with a \u003Cstrong>commercial speed of 33.63 km\u002Fh\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":25},"\u003Cp>\u003Cstrong>Lot South-West (L2)\u003C\u002Fstrong> , on the other hand, includes Cuneo, Saluzzo, the Cuneo valleys, and the western area. It totals \u003Cstrong>8,128,446 km\u002Fyear\u003C\u002Fstrong>, with annual \u003Cstrong>compensation of €15,740,688\u003C\u002Fstrong> and expected \u003Cstrong>fare revenues of €8,475,755\u003C\u002Fstrong>. The overall value stands at \u003Cstrong>€2.98\u002Fkm\u003C\u002Fstrong>, with a slightly higher \u003Cstrong>commercial speed of 34.64 km\u002Fh\u003C\u002Fstrong>.\u003C\u002Fp>\n",{"type":18,"html":27},"\u003Cp>These are therefore two lots that are not only similar in size, but also coherent from both a territorial and operational perspective, designed to ensure economic balance and industrial clarity within the basin.\u003C\u002Fp>\n",{"type":18,"html":29},"\u003Cp>Unlike other regional basins, the Southern Basin does not show significant separate components (such as in-house lots or sub-lots for weak demand areas), but rather a strong management concentration. The current structure is dominated by the Consorzio Granda Bus, which brings together 13 operators and effectively represents the main industrial player in the territory.\u003C\u002Fp>\n",{"type":18,"html":31},"\u003Cp>The framework is completed by a fleet of 308 buses and 370 PAO (other operational assets), confirming the significant size of the basin and its importance within the regional public transport system.\u003C\u002Fp>\n",{"type":18,"html":33},"\u003Cp>Overall, the Southern Basin presents a mature structure: the lots are clearly defined, the economic parameters are established, and the territory has been divided according to mobility demand logic. The tender therefore takes place in an already consolidated context, where the main challenge will be introducing competitive dynamics into a system that is currently highly concentrated.\u003C\u002Fp>\n",{"type":35,"head":36,"rows":48,"numeric":82,"rowHeads":83,"title":84,"caption":84},"table",[37,38,39,40,41,42,43,44,45,46,47],"Basin","Lots \u002F configuration","Km\u002Fyear","Compensation\u002Fyear (€)","Expected fare revenue\u002Fyear (€)","Compensation €\u002Fkm","Expected fare revenue €\u002Fkm","Total €\u002Fkm","Planned commercial speed (km\u002Fh)","Type of services","Areas served",[49,61,71],[50,51,52,53,54,55,56,57,58,59,60],"South – up for tender","South-East (L1)","8,051,434","16,252,136","8,751,150","2.02","1.09","3.11","33.63","Urban, extra-urban","Alba, Bra, Fossano, Mondovì",[50,62,63,64,65,66,67,68,69,59,70],"South-West (L2)","8,128,446","15,740,688","8,475,755","1.94","1.04","2.98","34.64","Cuneo, Saluzzo, Cuneo valleys",[72,73,74,75,76,77,78,79,80,81,81],"Total lots up for tender","2 lots up for tender: L1 East, L2 West","16,179,880","31,992,825","17,226,906","1.98","1.06","3.04","34.14","Urban and extra-urban services",[7,7,83,83,83,83,83,83,83,7,7],true,null,"\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a",[87],{"thumb":88,"large":14,"full":85,"alt":13},"\u002Fapi\u002Fassets\u002F447954a5-b057-4432-a8f2-d8bd5d0c6a0a?width=200&format=webp",{"title":84,"description":84,"image":84,"noindex":7},"en",[92,102,112],{"slug":93,"date":94,"theme":6,"featured":7,"title":95,"abstract":96,"cover":97,"coverAlt":98,"infographic":99,"infographicAlt":100,"infographicLarge":101,"infographicCount":15},"tpl-lombardia-lazio","2026-06-18","LPT and territorial disparities: Italy’s two-speed system reflected in the tenders issued by Milan and the Lazio region","An analytical comparison of fares, mileage and investment reveals a marked imbalance between funding in the North and that in the Centre and South for local public road transport. The analysis of the structural and economic state of Local Public Transport (LPT) in Italy compares two of the most significant tendering procedures of recent years: the tender issued by the Milan, Monza and Brianza, Lodi and Pavia basin, and the Lazio Region’s combined urban and extra-urban tender managed by Astral S.p.A. The data analysed reveal a clear and unequivocal divide in terms of the public resources allocated. The data examined show a clear and unequivocal divide in terms of public resources allocated. While the Milan basinallocates €1.248 billion for a 7-year contract, ensuring a weighted average compensation of €4.17 per km (rising to €4.46 per km when including over €86 million in capital contributions exclusively intended for fleet renewal), the Lazio Region has tendered a total value of €630.5 million spread over 9 years, corresponding to a weighted average compensation of just €2.33 per km, with no structural funding flows for vehicle fleets integrated into the base contract. Beyond the purely financial gap, a deep difference also emerges in the efficiency and administrative fluidity of the two procedures (in Lazio, the tender published in 2023 has yet to complete its awarding process), confirming the existence of territorial asymmetries that disadvantage Central and Southern Italy.","\u002Fapi\u002Fassets\u002Fcd91d059-329e-475e-be48-2ff8924344ec?width=800&format=webp","Mobility Metrics cover: side-by-side maps of the public transport tenders for the Milan basin (7-year contract, 5 lots) and the Lazio region (9 years, 11 lots, only 7 awarded)","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=500&format=webp","Infographic, Milan vs Lazio: weighted average fee of €4.17\u002Fkm against €2.33\u002Fkm, base tender value of €1.248bn against €630.5m, and no capital funding for new buses in Lazio","\u002Fapi\u002Fassets\u002Fb0374229-0681-4fbf-b7f3-450af0301bbf?width=1000&format=webp",{"slug":103,"date":104,"theme":6,"featured":7,"title":105,"abstract":106,"cover":107,"coverAlt":108,"infographic":109,"infographicAlt":110,"infographicLarge":111,"infographicCount":15},"tpl-lombardia-como-lecco-e-varese","2026-05-06","Lombardia LPT: Como, Lecco and Varese head toward tender","The new tender for local public transport in the Como–Lecco–Varese catchment area represents one of the most significant steps in the reorganisation of local public transport in Lombardy. The Catchment Area Programme provides for a total of approximately 31.68 million vehicle-kilometres per year, divided into five territorial lots: Como and the Lake, Brianza Comasca, Lecco, Varese and the Valleys, and the Varese area. Added to these is the ‘Cable Car Lot’, already awarded in 2024. Economic estimates point to a total figure of approximately €71.03 million in tender fees and €21.31 million in expected fare revenue, for a total estimated value of around €92.33 million per year. The estimated average fee is €2.24\u002Fkm, whilst average fare revenue accounts for approximately €0.67\u002Fkm, bringing the average total economic value to approximately €2.92\u002Fkm. The catchment area has a complex industrial structure: 1,343 employees in total as at 31 December 2024, of whom 1,234 are to be transferred to the new operators; a requirement for 857 buses, of which 516 are classified as essential and 215 are to be procured from scratch; and a network of 44 depots, some of which are considered essential for the continuity of the service.","\u002Fapi\u002Fassets\u002Fed0efaa6-b23d-441e-8c51-9c1ac4eee67a?width=800&format=webp","Mobility Metrics cover: map of the five lots in the Como-Lecco-Varese public transport tender (Como and Lake, Brianza Comasca, Lecco, Varese and Valleys, Varesotto), over 31.6 million vehicle-km a year","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=500&format=webp","Infographic on the Como-Lecco-Varese tender: 5 lots, 31.7 million km a year (22.3 million interurban), €71 million annual compensation, 1,343 staff and 857 vehicles required","\u002Fapi\u002Fassets\u002Fe860b949-1a41-4a6b-b655-9eca08f1eb59?width=1000&format=webp",{"slug":113,"date":114,"theme":6,"featured":7,"title":115,"abstract":116,"cover":117,"coverAlt":118,"infographic":119,"infographicAlt":120,"infographicLarge":121,"infographicCount":15},"tpl-lombardia-2026-gare","2026-05-04","Lombardia LPT 2026: the \"tender of tenders\"","Lombardia’s local public transport (TPL) system is heading toward a structural transformation by 2026, with the phase-out of old concessions and the introduction of a more integrated and controlled model. The system is organized into 6 Basin Agencies: the largest, Milan, Monza and Brianza, Lodi, and Pavia, covers four provinces and manages about 160 million bus-km per year, while the others cover provincial or multi-provincial areas with different territorial characteristics (mountainous, urban, or suburban).","\u002Fapi\u002Fassets\u002Fbbf8a83a-6913-4fd1-acf5-d8ecf99dfe35?width=800&format=webp","Mobility Metrics cover: map of Lombardy divided into its 6 public transport basin agencies, showing the number of lots planned for each 2026 tender","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=500&format=webp","Infographic on Lombardy's 2026 public transport tenders by basin: 271.8 million km a year and €665.9m in compensation; Milan-Monza-Lodi-Pavia is the largest at 158 million km and €4.14\u002Fkm","\u002Fapi\u002Fassets\u002Fbd4ff53d-f6c8-44f7-9561-b8ee95c6fd55?width=1000&format=webp"]